Breasting & Mooring Dolphins

This job consisted of installing 4,693 LF of 24” prestressed concrete pile. We poured 400+ cubic yards of concrete which included the pile caps, the breasting dolphin and the mooring dolphin (includes reinforcing, formwork, etc).
We completed installation of 305 lf (48” wide) of pre-stressed concrete walkways (includes handrail, anchor bolts, etc), installation of the dock structure fender system and barge fender system (includes the 60” dia x 80’ long pipe dolphins, all barge fenders, bollards, etc), fabrication and installation of all steel (ladders, crossover platform, steel for the rubber arch fenders on existing dock, etc), all electrical work (includes conduit, lighting, etc), and dredging

 
 